Riverside Public Utilities Electrify Riverside Level 2 charger rebate
Up to $1,500 for a Level 2 charger; up to $2,500 for SHARE low-income enrollees
March Air Reserve Base gets its power from Riverside Public Utilities and Southern California Gas Company (SoCalGas). Here's what you can claim and who can do the work.
Up to $1,500 for a Level 2 charger; up to $2,500 for SHARE low-income enrollees
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
No cost to the household. Every home served gets a heat pump for heating and cooling, a heat pump water heater, or both. Some homes also get induction cooking, laundry, building envelope and electrical remediation...
Pays battery owners, through their aggregator (storage VPP provider), for exporting during grid-stress events. The 2026 per-kW rate was not confirmed. The total budget is $109.5M, with about $34M left after projected...
No cost to the household. Eligible homes can get a heat pump water heater replacement installed free (SCE and PG&E pages), along with other efficiency upgrades. No dollar amount per household is published.
$750 per ton
$5 million -- a $500/kWh rebate (more for low-income customers)
Multifamily – Low-to-Moderate Income (LMI): Heat Pump for Space Heating and Cooling – Variable Speed (Heat Pump HVAC) $8,000; In-Unit Heat Pump Water Heater $1,750; Electric Load Service Center (Electric Panel)...
up to $8,000 for low-income households and $4,000 for moderate-income households for a heat pump HVAC unit
FULLY RESERVED since 2025-11-14, with no new reservations. The last amounts, per an SCE fact sheet: $1,000 for a heat pump water heater replacing an electric resistance unit, or up to $3,100 replacing a gas water...
Storage: 1,100/kWh; Solar: 3,100/kW
The rebate may cover 80 percent to 100 percent of the cost of installing a battery storage system.
CLOSED: these ratepayer budgets stopped taking new applications, including waitlist entries, after 2025-12-30. The Equity budget rate was $0.85/Wh. The final general-market step rate was not confirmed.
Loading map…
5 public charging stations in March Air Reserve Base: 17 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Sysco Riverside | 15750 Meridan Pkwy | 9 Level 2 | Blink Network | 24 hours daily |
| CNTYOFRIVERSIDE BCTC FIRE#1 | 16390 Bundy Ave | 2 Level 2 | ChargePoint Network | Mon: 7:00am-6:00pm; Tue: 7:00am-6:00pm; Wed: 7:00am-6:00pm; Thu: 7:00am-6:00pm; Fri: 7:00am-6:00pm; Sat: 7:00am-6:00pm; Sun: 7:00am-6:00pm |
| CNTYOFRIVERSIDE BCTCSHERIFFAD#1 | 16791 Davis Ave, Riverside, CA 92501 | 2 Level 2 | ChargePoint Network | Mon: 7:00am-6:00pm; Tue: 7:00am-6:00pm; Wed: 7:00am-6:00pm; Thu: 7:00am-6:00pm; Fri: 7:00am-6:00pm; Sat: 7:00am-6:00pm; Sun: 7:00am-6:00pm |
| CNTYOFRIVERSIDE BCTCSHERIFFAD#2 | 16793 Davis Ave, Riverside, CA 92501 | 2 Level 2 | ChargePoint Network | Mon: 7:00am-6:00pm; Tue: 7:00am-6:00pm; Wed: 7:00am-6:00pm; Thu: 7:00am-6:00pm; Fri: 7:00am-6:00pm; Sat: 7:00am-6:00pm; Sun: 7:00am-6:00pm |
| Western Municipal Water District | 14205 Meridian Pkwy | 2 Level 2 | Non-Networked | 7am-4:30pm daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.