EV charger installers in March Air Reserve Base, CA

Up to $2,500 in rebates from 2 programs. 0 licensed installers based in March Air Reserve Base.

What it really costs in March Air Reserve Base

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($2,500), a typical job could cost you as little as $0.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in March Air Reserve Base

Driving Clean Assistance Program (DCAP) - home charger incentive

Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...

Open California Air Resources Board (statewide; home charger... Checked 2026-10-11
Up to$2,000

EV charger installers

No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.

Public EV charging in March Air Reserve Base

Loading map…

5 public charging stations in March Air Reserve Base: 17 Level 2 ports.

StationAddressPortsNetworkHours
Sysco Riverside15750 Meridan Pkwy9 Level 2Blink Network24 hours daily
CNTYOFRIVERSIDE BCTC FIRE#116390 Bundy Ave2 Level 2ChargePoint NetworkMon: 7:00am-6:00pm; Tue: 7:00am-6:00pm; Wed: 7:00am-6:00pm; Thu: 7:00am-6:00pm; Fri: 7:00am-6:00pm; Sat: 7:00am-6:00pm; Sun: 7:00am-6:00pm
CNTYOFRIVERSIDE BCTCSHERIFFAD#116791 Davis Ave, Riverside, CA 925012 Level 2ChargePoint NetworkMon: 7:00am-6:00pm; Tue: 7:00am-6:00pm; Wed: 7:00am-6:00pm; Thu: 7:00am-6:00pm; Fri: 7:00am-6:00pm; Sat: 7:00am-6:00pm; Sun: 7:00am-6:00pm
CNTYOFRIVERSIDE BCTCSHERIFFAD#216793 Davis Ave, Riverside, CA 925012 Level 2ChargePoint NetworkMon: 7:00am-6:00pm; Tue: 7:00am-6:00pm; Wed: 7:00am-6:00pm; Thu: 7:00am-6:00pm; Fri: 7:00am-6:00pm; Sat: 7:00am-6:00pm; Sun: 7:00am-6:00pm
Western Municipal Water District14205 Meridian Pkwy2 Level 2Non-Networked7am-4:30pm daily

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.