SCE Charge Ready Home Installation Rebate (panel and 240 V circuit for EV charging)
Up to $4,200 for Electrical Panel Upgrade and EV Outlet Installation; Up to $1,000 for EV Outlet-Only Installation
Westlake Village gets its power from Southern California Edison (SCE), Clean Power Alliance and Southern California Gas Company (SoCalGas). Here's what you can claim and who can do the work.
Up to $4,200 for Electrical Panel Upgrade and EV Outlet Installation; Up to $1,000 for EV Outlet-Only Installation
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
Instant rebate of $400-$700 for replacing a natural gas storage water heater with a qualifying heat pump water heater. The amount depends on the type and size of the unit replaced (per Marin County page updated...
$200 on a qualifying portable generator, or $600 for income-qualified or Medical Baseline customers (SCE Marketplace). SCE's backup power page says up to $800, so the amounts conflict.
Solar Home Battery Signup Incentive $400 Subsequent Incentives $300/yr
$150 on a qualifying portable power station, limit 5 per SCE residential address, per one SCE page. SCE Marketplace listings dated from 2026-04-01 and the backup power page say up to $200.
$100 one-time per eligible EV or charger ($50 per plug-in hybrid), plus $5 per month for five smart-charging sessions at home
No cost to the household. Every home served gets a heat pump for heating and cooling, a heat pump water heater, or both. Some homes also get induction cooking, laundry, building envelope and electrical remediation...
Pays battery owners, through their aggregator (storage VPP provider), for exporting during grid-stress events. The 2026 per-kW rate was not confirmed. The total budget is $109.5M, with about $34M left after projected...
No cost to the household. Eligible homes can get a heat pump water heater replacement installed free (SCE and PG&E pages), along with other efficiency upgrades. No dollar amount per household is published.
$3/watt incentives to install an onsite solar system; Program budget: $120 million total ($10 million per year 2019 - 2030)
A free portable backup battery with a solar panel kit and 3-year warranty. Delivery and setup are free.
Multifamily – Low-to-Moderate Income (LMI): Heat Pump for Space Heating and Cooling – Variable Speed (Heat Pump HVAC) $8,000; In-Unit Heat Pump Water Heater $1,750; Electric Load Service Center (Electric Panel)...
up to $8,000 for low-income households and $4,000 for moderate-income households for a heat pump HVAC unit
FULLY RESERVED since 2025-11-14, with no new reservations. The last amounts, per an SCE fact sheet: $1,000 for a heat pump water heater replacing an electric resistance unit, or up to $3,100 replacing a gas water...
Storage: 1,100/kWh; Solar: 3,100/kW
The rebate may cover 80 percent to 100 percent of the cost of installing a battery storage system.
CLOSED: these ratepayer budgets stopped taking new applications, including waitlist entries, after 2025-12-30. The Equity budget rate was $0.85/Wh. The final general-market step rate was not confirmed.
Loading map…
Westlake Village has 80.3 public charging ports per 10,000 residents, against 17.5 across California. See how towns compare.
41 public charging stations in Westlake Village: 93 Level 2 ports and 28 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| North Ranch - Tesla Supercharger | 1125 Lindero Canyon Rd | 24 fast | Tesla | 24 hours daily |
| Regency Westlake Plaza (Westlake Village, CA) | 2725-2785 Agoura Rd | 4 fast | Electrify America | 24 hours daily |
| Westlake Village Building | One Dole Drive | 17 Level 2 | Blink Network | 24 hours daily |
| Four Seasons Westlake Village - Tesla Destination | 2 Dole Dr | 5 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| 30699 Russell Ranch Rd | 30699 Russell Ranch Rd | 4 Level 2 | LOOP | 24 hours daily |
| 30700 Russell Ranch Rd | 30700 Russell Ranch Rd | 4 Level 2 | LOOP | 24 hours daily |
| Amstar Searles 1 | 3011 Townsgate Road Suite 230 | 4 Level 2 | Blink Network | 24 hours daily |
| 30721 Russell Ranch Rd STE 100 | 30721 Russell Ranch Rd | 3 Level 2 | LOOP | 24 hours daily |
| 3059 COMMON 2 | 3059 Townsgate Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 3059 COMMON 3 | 3059 Townsgate Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 10 of 41.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.