SCE Charge Ready Home Installation Rebate (panel and 240 V circuit for EV charging)
Up to $4,200 for Electrical Panel Upgrade and EV Outlet Installation; Up to $1,000 for EV Outlet-Only Installation
Riverside gets its power from Riverside Public Utilities, Southern California Edison (SCE) and Southern California Gas Company (SoCalGas). Here's what you can claim and who can do the work.
Up to $4,200 for Electrical Panel Upgrade and EV Outlet Installation; Up to $1,000 for EV Outlet-Only Installation
Up to $1,500 for a Level 2 charger; up to $2,500 for SHARE low-income enrollees
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
Instant rebate of $400-$700 for replacing a natural gas storage water heater with a qualifying heat pump water heater. The amount depends on the type and size of the unit replaced (per Marin County page updated...
$200 on a qualifying portable generator, or $600 for income-qualified or Medical Baseline customers (SCE Marketplace). SCE's backup power page says up to $800, so the amounts conflict.
$150 on a qualifying portable power station, limit 5 per SCE residential address, per one SCE page. SCE Marketplace listings dated from 2026-04-01 and the backup power page say up to $200.
No cost to the household. Every home served gets a heat pump for heating and cooling, a heat pump water heater, or both. Some homes also get induction cooking, laundry, building envelope and electrical remediation...
Pays battery owners, through their aggregator (storage VPP provider), for exporting during grid-stress events. The 2026 per-kW rate was not confirmed. The total budget is $109.5M, with about $34M left after projected...
No cost to the household. Eligible homes can get a heat pump water heater replacement installed free (SCE and PG&E pages), along with other efficiency upgrades. No dollar amount per household is published.
$3/watt incentives to install an onsite solar system; Program budget: $120 million total ($10 million per year 2019 - 2030)
A free portable backup battery with a solar panel kit and 3-year warranty. Delivery and setup are free.
$750 per ton
$5 million -- a $500/kWh rebate (more for low-income customers)
Multifamily – Low-to-Moderate Income (LMI): Heat Pump for Space Heating and Cooling – Variable Speed (Heat Pump HVAC) $8,000; In-Unit Heat Pump Water Heater $1,750; Electric Load Service Center (Electric Panel)...
up to $8,000 for low-income households and $4,000 for moderate-income households for a heat pump HVAC unit
FULLY RESERVED since 2025-11-14, with no new reservations. The last amounts, per an SCE fact sheet: $1,000 for a heat pump water heater replacing an electric resistance unit, or up to $3,100 replacing a gas water...
Storage: 1,100/kWh; Solar: 3,100/kW
The rebate may cover 80 percent to 100 percent of the cost of installing a battery storage system.
CLOSED: these ratepayer budgets stopped taking new applications, including waitlist entries, after 2025-12-30. The Equity budget rate was $0.85/Wh. The final general-market step rate was not confirmed.
Loading map…
Riverside has 8.5 public charging ports per 10,000 residents, against 17.5 across California. See how towns compare.
124 public charging stations in Riverside: 226 Level 2 ports and 113 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Riverside, CA - Tesla Supercharger | 3370 9th St | 24 fast | Tesla | 24 hours daily. Open to Teslas only. |
| Jurupa Valley, CA - Tesla Supercharger | 8169 Mission Blvd | 20 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Riverside, CA - Canyon Springs Parkway - Tesla Supercharger | 2755 Canyon Springs Parkway | 16 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Riverside, CA Rechargery Relay - Van Buren Boulevard | 18171 Van Buren Boulevard | 12 fast | IONNA | 24 hours daily |
| The Shops at Jurupa Valley (Jurupa Valley, CA) | 8178-8170 Mission Boulevard & Pyrite | 10 fast | Electrify America | 24 hours daily |
| City of Riverside-University Ave & Market St (Riverside, CA) | 3750 University Avenue | 8 fast | Electrify America | 24 hours daily |
| Glen Avon Market Shopping Center | 9001 Mission Blvd | 6 fast | EVOLV_CHARGING | 24 hours daily |
| Walmart 1899 (Riverside, CA) | 6250 Valley Springs Parkway | 4 fast | Electrify America | 24 hours daily |
| Hyatt Place Riverside | 3500 Market St | 3 fast | EVCS | |
| US Bank Jurupa Valley | 9103 Mission Blvd | 2 fast | EVCS |
Showing 10 of 124.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.