SCE Charge Ready Home Installation Rebate (panel and 240 V circuit for EV charging)
Up to $4,200 for Electrical Panel Upgrade and EV Outlet Installation; Up to $1,000 for EV Outlet-Only Installation
Hawthorne gets its power from Southern California Edison (SCE), Clean Power Alliance and Southern California Gas Company (SoCalGas). Here's what you can claim and who can do the work.
Up to $4,200 for Electrical Panel Upgrade and EV Outlet Installation; Up to $1,000 for EV Outlet-Only Installation
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
Instant rebate of $400-$700 for replacing a natural gas storage water heater with a qualifying heat pump water heater. The amount depends on the type and size of the unit replaced (per Marin County page updated...
$200 on a qualifying portable generator, or $600 for income-qualified or Medical Baseline customers (SCE Marketplace). SCE's backup power page says up to $800, so the amounts conflict.
Solar Home Battery Signup Incentive $400 Subsequent Incentives $300/yr
$150 on a qualifying portable power station, limit 5 per SCE residential address, per one SCE page. SCE Marketplace listings dated from 2026-04-01 and the backup power page say up to $200.
$100 one-time per eligible EV or charger ($50 per plug-in hybrid), plus $5 per month for five smart-charging sessions at home
No cost to the household. Every home served gets a heat pump for heating and cooling, a heat pump water heater, or both. Some homes also get induction cooking, laundry, building envelope and electrical remediation...
Pays battery owners, through their aggregator (storage VPP provider), for exporting during grid-stress events. The 2026 per-kW rate was not confirmed. The total budget is $109.5M, with about $34M left after projected...
No cost to the household. Eligible homes can get a heat pump water heater replacement installed free (SCE and PG&E pages), along with other efficiency upgrades. No dollar amount per household is published.
$3/watt incentives to install an onsite solar system; Program budget: $120 million total ($10 million per year 2019 - 2030)
A free portable backup battery with a solar panel kit and 3-year warranty. Delivery and setup are free.
Multifamily – Low-to-Moderate Income (LMI): Heat Pump for Space Heating and Cooling – Variable Speed (Heat Pump HVAC) $8,000; In-Unit Heat Pump Water Heater $1,750; Electric Load Service Center (Electric Panel)...
up to $8,000 for low-income households and $4,000 for moderate-income households for a heat pump HVAC unit
FULLY RESERVED since 2025-11-14, with no new reservations. The last amounts, per an SCE fact sheet: $1,000 for a heat pump water heater replacing an electric resistance unit, or up to $3,100 replacing a gas water...
Storage: 1,100/kWh; Solar: 3,100/kW
The rebate may cover 80 percent to 100 percent of the cost of installing a battery storage system.
CLOSED: these ratepayer budgets stopped taking new applications, including waitlist entries, after 2025-12-30. The Equity budget rate was $0.85/Wh. The final general-market step rate was not confirmed.
Loading map…
Hawthorne has 9.1 public charging ports per 10,000 residents, against 17.5 across California. See how towns compare.
21 public charging stations in Hawthorne: 40 Level 2 ports and 41 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Hawthorne, CA - West 120th Street - Tesla Supercharger | 2700 West 120th Avenue | 20 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Hawthorne, CA - El Segundo Boulevard - Tesla Supercharger | 4427 West El Segundo Boulevard | 12 fast | Tesla | 24 hours daily. Open to Teslas only. |
| Lowe's of Hawthorne | 2800 W 120th St | 8 fast | eVgo Network | 24 hours daily |
| US Bank Hawthorne | 12801 Hawthorne Blvd | 1 fast | EVCS | |
| Hawthorne-Hawthorne - Tesla Destination | One Rocket Rd | 8 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| Hampton Inn Los Angeles Int'l Airport Hawthorne - Tesla Destination | 11430 Acacia Ave | 5 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| Ayres Hotel Hawthorne | 14400 Hindry Ave | 3 Level 2 | LOOP | 24 hours daily |
| Ayres Hotel Manhattan Beach/Hawthorne - Tesla Destination | 14400 Hindry Ave | 3 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| City of Hawthorne-City Hall Fleet Parking | 12603 Grevillea Ave | 2 Level 2 | OpConnect | 24 hours daily |
| WISEBURN USD AVIATION 3 | 5403 West 138th Street | 2 Level 2 | ChargePoint Network | Mon: 4:30pm-10:00pm; Tue: 4:30pm-10:00pm; Wed: 4:30pm-10:00pm; Thu: 4:30pm-10:00pm; Fri: 4:30pm-10:00pm; Sat: 6:00am-10:00pm; Sun: 6:00am-10:00pm |
Showing 10 of 21.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.