PG&E Residential EV Charging rebate (Rebate Plus, income-qualified)
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Fort Bragg gets its power from Pacific Gas and Electric Company (PG&E) and Sonoma Clean Power. Here's what you can claim and who can do the work.
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
$1,000 for a heat pump for heating and cooling; up to $3,500 for hydronic heat pump systems. CARE/FERA: 50% of remaining project cost, up to $10,000.
Up to $2,500 for installs from 2026-06-01 to 2028-03-01; after that, CARE/FERA customers only. CARE/FERA customers can instead get 50% of the project cost left after other rebates, up to $10,000.
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
Instant rebate of $400-$700 for replacing a natural gas storage water heater with a qualifying heat pump water heater. The amount depends on the type and size of the unit replaced (per Marin County page updated...
Up to $300 per qualified customer account; CARE or FERA customers may receive up to an additional $200 (up to $500 total)
No cost to the household. Every home served gets a heat pump for heating and cooling, a heat pump water heater, or both. Some homes also get induction cooking, laundry, building envelope and electrical remediation...
Pays battery owners, through their aggregator (storage VPP provider), for exporting during grid-stress events. The 2026 per-kW rate was not confirmed. The total budget is $109.5M, with about $34M left after projected...
No cost to the household. Eligible homes can get a heat pump water heater replacement installed free (SCE and PG&E pages), along with other efficiency upgrades. No dollar amount per household is published.
$3/watt incentives to install an onsite solar system; Program budget: $120 million total ($10 million per year 2019 - 2030)
A free permanent backup battery system, installed at no cost. More than 3,800 customers have received one since 2022. PG&E says free batteries are almost gone for 2026.
$5/month maximum bill credit for smart device participation, regardless of the number and type of devices participating.
Multifamily – Low-to-Moderate Income (LMI): Heat Pump for Space Heating and Cooling – Variable Speed (Heat Pump HVAC) $8,000; In-Unit Heat Pump Water Heater $1,750; Electric Load Service Center (Electric Panel)...
up to $8,000 for low-income households and $4,000 for moderate-income households for a heat pump HVAC unit
FULLY RESERVED since 2025-11-14, with no new reservations. The last amounts, per an SCE fact sheet: $1,000 for a heat pump water heater replacing an electric resistance unit, or up to $3,100 replacing a gas water...
Storage: 1,100/kWh; Solar: 3,100/kW
The rebate may cover 80 percent to 100 percent of the cost of installing a battery storage system.
CLOSED: these ratepayer budgets stopped taking new applications, including waitlist entries, after 2025-12-30. The Equity budget rate was $0.85/Wh. The final general-market step rate was not confirmed.
free backup power transfer meter
Applications for 2026 are closed. The Portable Battery Program has reached capacity for 2026. The program is no longer accepting new applications.
Loading map…
Fort Bragg has 35.1 public charging ports per 10,000 residents, against 17.5 across California. See how towns compare.
10 public charging stations in Fort Bragg: 15 Level 2 ports and 14 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Fort Bragg, CA - Tesla Supercharger | 171 Boatyard Drive | 12 fast | Tesla | 24 hours daily. NACS partner enabled. |
| 124 E Pine St | 124 E Pine St | 2 fast | EV Connect | 24 hours daily |
| BOATYARD NEW STATION | 171 Boatyard Drive | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CH CITY HALL | 416 N Franklin St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CH NEW STATION | 248 E Laurel St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| California State Parks - MacKerricher Visitor Center | 24100 MacKerricher Park Rd | 2 Level 2 | RIVIAN_WAYPOINTS | 24 hours daily |
| GENERATOR SHED GENERATOR SHED | 500 Casa Del Noyo | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MENDO COLLEGE FORTBRAGG EV1 | 1211 Del Mar Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Ocean View Lodge - Tesla Destination | 1141 N Main St | 2 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| Beachcomber Motel & Spa on the Beach - Tesla Destination | 1111 N Main St | 1 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.