EV charger installers in Rosemary Beach, FL

1 rebate program available. 2 licensed installers based in Rosemary Beach.

What it really costs in Rosemary Beach

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Rosemary Beach

EV charger installers

Bgn Contractors

Inlet Beach, 32461
52
Home batteryEV chargerStandby generatorHeat pump
Certified Electrical Contractor EC13010172 Licensed since 2020
Contact through our quote form

Streetleaf Infrastructure, LLC

Inlet Beach, 32461
30
Home batteryEV chargerStandby generator
Certified Electrical Contractor EC13016359 Licensed since 2026
Contact through our quote form

Public EV charging in Rosemary Beach

Loading map…

4 public charging stations in Rosemary Beach: 7 Level 2 ports and 4 DC fast ports.

StationAddressPortsNetworkHours
FPL EVolution - Watersound Town Center11291 US-984 fastFPLEV24 hours daily
Alys Beach - Tesla Destination9581 E County Highway 30A4 Level 2Tesla Destination24 hours daily. Open to Teslas only.
COMPASS POINT COMPASS POINT99 Compass Way2 Level 2ChargePoint Network24 hours daily
The Lofts at Seacrest Beach65 Redbud Lane1 Level 2Blink Network24 hours daily

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.