SCE Charge Ready Home Installation Rebate (panel and 240 V circuit for EV charging)
Up to $4,200 for Electrical Panel Upgrade and EV Outlet Installation; Up to $1,000 for EV Outlet-Only Installation
Up to $4,200 in rebates from 2 programs. 19 licensed installers based in Signal Hill.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($4,200), a typical job could cost you as little as $0.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $4,200 for Electrical Panel Upgrade and EV Outlet Installation; Up to $1,000 for EV Outlet-Only Installation
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
Loading map…
15 public charging stations in Signal Hill: 23 Level 2 ports and 29 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Signal Hill, CA - Tesla Supercharger | 1800 E Willow St | 28 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Mother's Market | 2475 Cherry Ave | 1 fast | eVgo Network | 24 hours daily |
| FJ LB A Acquistion, LLC dba Audi Long Beach | 2998 Cherry Avenue | 5 Level 2 | Blink Network | 24 hours daily |
| MBZ LONG BEACH MBZ LONG BEACH | 2300 E Spring St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SIGNAL HILL LIBRARY | 1800 E Hill St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SIGNAL HILL SH UP LOT 1-2 | 1919 E Hill St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SIGNAL HILL SH UP LOT 3-4 | 1918 East Hill Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SIGNAL HILL STATION 1 | 1919 E Hill St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SIGNAL HILL STATION 2 | 1919 E Hill St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| LBH CPF50 1 | 1500 East Spring Street | 1 Level 2 | ChargePoint Network | 24 hours daily |
| LBH CPF50 2 | 1500 East Spring Street | 1 Level 2 | ChargePoint Network | 24 hours daily |
| LBH EXTERIOR WALL 1 | 1500 East Spring Street | 1 Level 2 | ChargePoint Network | 24 hours daily |
| LONG BEACH HON EXTERIOR WALL 2 | 1500 East Spring Street | 1 Level 2 | ChargePoint Network | 24 hours daily |
| LONG BEACH HON SIDE LOT 1 | 1500 East Spring Street | 1 Level 2 | ChargePoint Network | 24 hours daily |
| LONG BEACH HON SIDE LOT 2 | 1500 East Spring Street | 1 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.