PG&E Residential EV Charging rebate (Rebate Plus, income-qualified)
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Up to $5,000 in rebates from 2 programs. 32 licensed installers based in Millbrae.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($5,000), a typical job could cost you as little as $0.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
Loading map…
30 public charging stations in Millbrae: 55 Level 2 ports and 15 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| City of Millbrae - Library | 1 Library Ave | 6 fast | eVgo Network | 24 hours daily |
| Chevron #2200 | 320 E Millbrae Ave | 4 fast | eVgo Network | 24 hours daily |
| City of Millbrae - Broadway | 446 Broadway | 3 fast | eVgo Network | 24 hours daily |
| City of Millbrae - Magnolia | 320 Magnolia Ave. | 2 fast | eVgo Network | 24 hours daily |
| Residence Inn San Francisco Airport Millbrae Station - Tesla Destination | 161 N Rollins Rd | 7 Level 2 | Tesla Destination | 24 hours daily. Open to all vehicles. |
| Millwood Inn and Suites - Tesla Destination | 1375 El Camino Real | 3 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| CCSF - SFO SFO INT LOT G12 | San Francisco International Airport Internati | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HELLYER OAKS 166 N. ROLLINS | 166 North Rollins Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HELLYER OAKS 166 N. ROLLINS2 | 166 North Rollins Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HELLYER OAKS 166 N. ROLLINS3 | 166 North Rollins Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HELLYER OAKS 166 N. ROLLINS4 | 166 North Rollins Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MILLBRAE 446 BROADWAY #1 | 446 Broadway | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MILLBRAE 446 BROADWAY #2 | 446 Broadway | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MILLBRAE 477 LINCOLN #1 | 477 Lincoln Cir | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MILLBRAE 477 LINCOLN #2 | 477 Lincoln Cir | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MILLBRAE 477 LINCOLN #3 | 477 Lincoln Cir | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MILLBRAE CITY HALL #3 | 623 Magnolia Avenue | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MILLBRAE CITY HALL #4 | 623 Magnolia Avenue | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MILLBRAE CITY HALL #5 | 623 Magnolia Avenue | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MILLBRAE FARMER'S MKT #1 | 290 Broadway | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MILLBRAE FARMER'S MKT #2 | 290 Broadway | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SMUHSD MHS 1 | 400 Murchison Dr. | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SMUHSD MHS 2 | 400 Murchison Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SMUHSD MHS 3 | 400 Murchison Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SMUHSD MHS 4 | 400 Murchison Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 30.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.