A typical tesla powerwall 3 (13.5 kwh), installed costs $14,500 installed. Most jobs land between $11,500 and $18,500 (one powerwall 3 (13.5 kwh, integrated hybrid inverter), backup gateway/backup switch, wiring, mounting, permit, interconnection paperwork, commissioning. expansion units extra (~$6,000 each). excludes main-panel or service upgrade (+$3,000-$5,000 where needed) and solar.).
We haven't found a rebate for this project here right now.
Pays battery owners, through their aggregator (storage VPP provider), for exporting during grid-stress events. The 2026 per-kW rate was not confirmed. The total budget is $109.5M, with about $34M left after projected...
Limited fundsCalifornia Energy CommissionNot yet confirmed
A free permanent backup battery system, installed at no cost. More than 3,800 customers have received one since 2022. PG&E says free batteries are almost gone for 2026.
Limited fundsPacific Gas and Electric Company (PG&E)Checked 2026-10-11
CLOSED: these ratepayer budgets stopped taking new applications, including waitlist entries, after 2025-12-30. The Equity budget rate was $0.85/Wh. The final general-market step rate was not confirmed.
Not taking applicationsCalifornia Public Utilities Commission (PG&E, SCE,...Not yet confirmed
Home battery installers
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.