EV charger installers in Port Townsend, WA
8 licensed installers based in Port Townsend.
What it really costs in Port Townsend
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Port Townsend
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Christophers Electric Co INC
Port Townsend, 98368Current Electric Of P T INC
Port Townsend, 98368Dan's Tv & Satellite INC
Port Townsend, 98368Evergreen Electrical Sys LLC
Port Townsend, 98368Frederickson Electric Inc
Port Townsend, 98368Power Trip Energy Corporation
Port Townsend, 98368Rnr Electrical Services LLC
Port Townsend, 98368Public EV charging in Port Townsend
Loading map…
12 public charging stations in Port Townsend: 38 Level 2 ports and 8 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| City of Port Townsend | 2409 Jefferson St | 8 fast, 1 Level 2 | EVCS | |
| Jefferson Healthcare | 834 Sheridan Street | 16 Level 2 | CHARGELAB | |
| Tacoma Recovery and Transfer Center | 3510 South Mullen Street | 5 Level 2 | Blink Network | 24 hours daily |
| Jefferson Transit Authority | 63 4 Corners Road | 4 Level 2 | Blink Network | 24 hours daily |
| Food Co-Op | 414 Kearney St | 2 Level 2 | Non-Networked | 24 hours daily |
| GreenPod Development | 1531 W Sims Way | 2 Level 2 | Non-Networked | 24 hours daily |
| Power Trip Energy Corp | 83 Denny Ave | 2 Level 2 | Non-Networked | 24 hours daily |
| WEST HARBOR 6 | 2500 9th St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Discovery Bay Welcome Center | 282332 US-101 | 1 Level 2 | Non-Networked | 24 hours daily |
| Huber's Inn | 1421 Landes St | 1 Level 2 | Non-Networked | 24 hours daily |
| ReVision Marine | 301 10th Street | 1 Level 2 | Blink Network | 24 hours daily |
| Windermere Real Estate | 1220 Water St | 1 Level 2 | Non-Networked | 8am-5pm daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.