EV charger installers in Colville, WA
10 licensed installers based in Colville.
What it really costs in Colville
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Colville
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Fogle Pump & Supply INC
Colville, 99114Seymour Channels Satellite
Colville, 99114Tahoma Electric INC
Colville, 99114ABC Heating & Electric LLC
Colville, 99114Northside Heat & Cool
Colville, 99114Floener Electric
Colville, 99114Mitchell Electric
Colville, 99114Tri-county Electric LLC
Colville, 99114Apex Mechanical Wa LLC
Colville, 99114Public EV charging in Colville
Loading map…
5 public charging stations in Colville: 7 Level 2 ports and 12 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Colville Retail Center | 102 Ponderosa Rd | 8 fast, 1 Level 2 | RED_E | |
| Avista - City of Colville DCFC | 250 W. 1st Ave | 4 fast | FLO | 24 hours daily |
| Avista - City of Colville ACL2 | 250 W. 1st St | 2 Level 2 | FLO | 24 hours daily |
| City of Colville - 202 N Main | 202 N Main St | 2 Level 2 | FLO | 24 hours daily |
| City of Colville - City Hall | 170 S Oak St | 2 Level 2 | FLO | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.