EV charger installers in Chelan, WA
11 licensed installers based in Chelan.
What it really costs in Chelan
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Chelan
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Hanson Electric Of Chelan INC
Chelan, 98816Sli Electric LLC
Chelan, 98816Strata INC
Chelan, 98816Vadnais Electric
Chelan, 98816Holden's Air LLC
Chelan, 98816Mvm Quality Drilling LLC
Chelan, 98816Bob's Electric
Chelan, 98816Raven Electric LLC
Chelan, 98816Culvers Electric LLC
Chelan, 98816Wye Mechanical LLC
Chelan, 98816Public EV charging in Chelan
Loading map…
5 public charging stations in Chelan: 5 Level 2 ports and 2 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| DCPUD WELLS DAM PL 1 | 375 Azwell Road | 2 fast | ChargePoint Network | 24 hours daily |
| City of Chelan | 137 E Johnson Ave | 2 Level 2 | Non-Networked | 24 hours daily |
| Campbell's Lake Chelan Resort | 104 W Woodin Ave | 1 Level 2 | Non-Networked | 24 hours daily; guest use only; drivers must bring their own J1772 cordset for Level 1 charging |
| Fielding Hills Winery - Tesla Destination | 565 S Lakeshore Dr | 1 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| Mellisoni Vineyard | 3155 US 97A | 1 Level 2 | Non-Networked | 24 hours daily; Drivers must bring their own J1772 cordset for Level 1 charging |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.