EV charger installers in Sterling, VA
49 licensed installers based in Sterling.
What it really costs in Sterling
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Sterling
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Anb Telecom & Electric LLC
Sterling, 20164Bowman S Plumbing Heating Air Conditioning And Electrical INC
Sterling, 20166Bribec Group LLC
Sterling, 20166Cedar Electrical Services INC
Sterling, 20164Huntington Electric Co INC
Sterling, 20166Pars Electric INC
Potomac Falls, 20165Sarosa Electric LLC
Sterling, 20166Meade S Heating And Air LLC
Sterling, 20166A/c Doc INC
Sterling, 20165Ccci-gov LLC
Dulles, 20166Connectivity Solutions INC
Sterling, 20164Show all 49 installers
- Crs Electric Company INC
- Douglas D Shonnard
- Fire Solutions LLC
- I D Electric LLC
- Ini INC
- Jo Electrical LLC
- Luan Duy Luong
- Mac General INC
- Mohamad Hamed
- Northern Virginia Mechanical Services INC
- Reuter Contracting Services LLC
- Robert E Sobun
- Siltek INC
- T & M Electric INC
- Terry Wayne Atkins
- Ths Property Services INC
- Tower Electric LLC
- Tvm Electric Co INC
- Victor Manuel Penate
- Jespar Electric LLC
- Urban General Contracting INC
- Advance Telecommunication Implementation Solution LLC
- Hylan Mid-atlantic LLC
- Kimlouf - Electric LLC
- Hp Electric Services LLC
- Aloha Electric
- Effortless Electric LLC
- Manmour LLC
- Total Renovation LLC
- A To Z Electrical & Mechanical Services INC
- S&i Electric LLC
- Active Security Consulting LLC
- Blackhawk Electric LLC
- Engivision Systems LLC
- J&h Systems LLC
- Kpss Ventures LLC
- Ridgeview Mission Critical LLC
Public EV charging in Sterling
Loading map…
72 public charging stations in Sterling: 133 Level 2 ports and 40 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Sterling, VA - Russell Branch Parkway - Tesla Supercharger | 45950 Russell Branch Parkway | 12 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Sterling, VA - Tesla Supercharger | 23055 Oakgrove Road | 8 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Koons Sterling Ford | 46869 Leesburg Pike | 4 fast | FORD_CHARGE | 24 hours daily |
| Sheetz Store 622 (Sterling, VA) | 45550 Dulles Plz | 4 fast | Electrify America | 24 hours daily |
| Walmart 3639 (Dulles, VA) | 24635 Dulles Landing Dr | 4 fast | Electrify America | 24 hours daily |
| Dulles Town Center | 21076 Dulles Town Cir | 2 fast, 1 Level 2 | eVgo Network | 24 hours daily |
| Brown's Dulles Nissan | 45155 Towlern Pl | 1 fast, 1 Level 2 | Non-Networked | Dealership business hours |
| L379 BMW 4 | 21710 Auto World Cir | 1 fast | ChargePoint Network | 24 hours daily |
| L379 BMW STATION 2 | 21710 Auto World Cir | 1 fast | ChargePoint Network | 24 hours daily |
| L379 BMW STATION 3 | 21710 Auto World Cir | 1 fast | ChargePoint Network | 24 hours daily |
| L379 STATION | 21710 Auto World Cir | 1 fast | ChargePoint Network | 24 hours daily |
| STERLING SUBARU DC-CPE250-1 | 21736 Auto World Circle | 1 fast | ChargePoint Network | 24 hours daily |
| Dulles Airport | 44701 Propeller Ct | 14 Level 2 | OpConnect | 24 hours daily |
| 45610 Woodland Road | 45610 Woodland Road | 4 Level 2 | Blink Network | 24 hours daily |
| Loudoun Tech | 21400 Ridgetop Circle | 4 Level 2 | Blink Network | 24 hours daily |
| 100 Carpenter | 100 Carpenter Drive | 2 Level 2 | Blink Network | 24 hours daily |
| DEV EVSP AD 1U #6 | 9300 Cargo Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DEV EVSP IAD 1R #1 | 9300 Cargo Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DEV EVSP IAD 1R #2 | 9300 Cargo Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DEV EVSP IAD 1R #3 | 9300 Cargo Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DEV EVSP IAD 1R #4 | 9300 Cargo Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DEV EVSP IAD 1U #1 | 9300 Cargo Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DEV EVSP IAD 1U #2 | 9300 Cargo Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DEV EVSP IAD 1U #3 | 9300 Cargo Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DEV EVSP IAD 1U #4 | 9300 Cargo Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 72.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.