GVEC electric vehicle charging station rebate
For residential installations, the lesser option of $600 or 50% of total installation costs
Up to $600 in rebates from 1 program. 37 licensed installers based in Seguin.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($600), a typical job could cost you as little as $1,300.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
For residential installations, the lesser option of $600 or 50% of total installation costs
Loading map…
6 public charging stations in Seguin: 0 Level 2 ports and 12 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| La Quinta Inn (Seguin, TX) | 1501 N State Highway 46 | 4 fast | Electrify America | 24 hours daily |
| Seguin, TX Rechargery Relay @ Circle K - W Ih 10 | 1805 W Ih 10 | 4 fast | IONNA | 24 hours daily |
| GVEC DC 1 | 927 TX-46 | 1 fast | ChargePoint Network | 24 hours daily |
| GVEC DC 2 | 6400 I-10 | 1 fast | ChargePoint Network | 24 hours daily |
| HALFTIME 3 STATION 1 | 101 Meadow Lake Drive | 1 fast | ChargePoint Network | 24 hours daily |
| HALFTIME 3 STATION 2 | 101 Meadow Lake Drive | 1 fast | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.