EV charger installers in San Juan, TX
11 licensed installers based in San Juan.
What it really costs in San Juan
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in San Juan
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Can2 Electric
San Juan, 78589Evolution Electrical & Construction LLC
San Juan, 78589Gargon Power Services LLC
San Juan, 78589Gonzalez Energy Solutions
San Juan, 78589Integrity Electric LLC
San Juan, 78589J-gd Electric
San Juan, 78589Jose A Pardo DBA Jp Electrical Service
San Juan, 78589Leal Electric Company LLC
San Juan, 78589Rej Electric LLC
San Juan, 78589Static Electric LLC
San Juan, 78589Public EV charging in San Juan
Loading map…
7 public charging stations in San Juan: 5 Level 2 ports and 4 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Audi San Juan | 1001 E Interstate 2 | 2 fast | EVGATEWAY | Mon: 7:00am-8:00pm; Tue: 7:00am-8:00pm; Wed: 7:00am-8:00pm; Thu: 7:00am-8:00pm; Fri: 7:00am-8:00pm; Sat: 7:00am-7:30pm |
| Acura of The Rio Grance Valley - Service | 1201 East Expressway 83 | 1 fast | Blink Network | 24 hours daily |
| MB OF SAN JUAN CPE250 01 | 400 E Expressway 83 | 1 fast | ChargePoint Network | 24 hours daily |
| Acura of The Rio Grance Valley | 1201 East Expressway 83 | 2 Level 2 | Blink Network | 24 hours daily |
| HOME2 SJ LEFT ONE CHARGE | 1003 East Carroll Road | 1 Level 2 | ChargePoint Network | 24 hours daily |
| HOME2 SJ LEFT TWO CHARGE | 1003 East Carroll Road | 1 Level 2 | ChargePoint Network | 24 hours daily |
| HOME2 SJ RIGHT ONE CHARG | 1003 East Carroll Road | 1 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.