EV charger installers in Marble Falls, TX

23 licensed installers based in Marble Falls.

What it really costs in Marble Falls

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Marble Falls

We haven't found a program specific to this area yet. Statewide programs are on the state page.

EV charger installers

Show all 23 installers

Public EV charging in Marble Falls

Loading map…

4 public charging stations in Marble Falls: 7 Level 2 ports.

StationAddressPortsNetworkHours
FLATZ 830 STATION 16025 U.S. 281 Leasing Office2 Level 2ChargePoint Network24 hours daily
FLATZ 830 STATION 26025 U.S. 281 Leasing Office2 Level 2ChargePoint Network24 hours daily
La Quinta Inn & Suites by Wyndham Marble Falls - Tesla Destination501 Ranch to Market Rd 21472 Level 2Tesla Destination24 hours daily. Open to all vehicles.
Apache Village Shops1802 US Hwy 2811 Level 2Non-Networked24 hours daily

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.