EV charger installers in Hearne, TX
4 licensed installers based in Hearne.
What it really costs in Hearne
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Hearne
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
R2 Electrical Service
Hearne, 77859Scarmardo Electric
Hearne, 77859The Turner Company LLC
Hearne, 77859Public EV charging in Hearne
Loading map…
1 public charging station in Hearne: 0 Level 2 ports and 12 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Hearne TX | 1656 S Market St Hearne | 12 fast | SHELL_RECHARGE | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.