EV charger installers in Aransas Pass, TX
10 licensed installers based in Aransas Pass.
What it really costs in Aransas Pass
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Aransas Pass
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Ciara Electric Service Co
Aransas Pass, 78335Coastal Bend Services Unlimited LLC
Aransas Pass, 78336Durham Electric INC
Aransas Pass, 78336Electrified Electric
Aransas Pass, 78336Intercoastal Electric
Aransas Pass, 78336Irving Electric And HVAC LLC
Aransas Pass, 78336Jm Davidson Ltd
Aransaspass, 78336Reel Electric LLC
Aransas Pass, 78336Ronald W Howe LLC DBA Premier Electric
Aransas Pass, 78336Public EV charging in Aransas Pass
Loading map…
2 public charging stations in Aransas Pass: 6 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Candlewood Suites Aransas Pass - Tesla Destination | 501 E Goodnight Ave | 3 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| Microtel Inn and Suites Aransas Pass - Tesla Destination | 355 E Goodnight Ave | 3 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.