ODOT Community Charging Rebates (Round 5) - multifamily Level 2 charging
$8,000 per Level 2 charging port and $80,000 per DC fast charging port, or up to 80-95% of eligible project costs, whichever is lower
Up to $8,000 in rebates from 1 program. 0 licensed installers based in Chemult.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($8,000), a typical job could cost you as little as $0.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
$8,000 per Level 2 charging port and $80,000 per DC fast charging port, or up to 80-95% of eligible project costs, whichever is lower
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
3 public charging stations in Chemult: 0 Level 2 ports and 16 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Chemult, OR - Tesla Supercharger | 94401 US-97 | 8 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Pacific Power Diamond Lake (Diamond Lake, OR) | 350 Resort Dr | 4 fast | Electrify America | 24 hours daily |
| Pilot Travel Center 133 | 109450 US-97 | 4 fast | eVgo Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.