EV charger installers in Suffern, NY
0 licensed installers based in Suffern.
What it really costs in Suffern
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Suffern
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Public EV charging in Suffern
Loading map…
12 public charging stations in Suffern: 66 Level 2 ports and 8 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Indian Rock Shopping Center - Tesla Supercharger (EVIO) | 10 Indian Rock | 8 fast | Tesla | 24 hours daily |
| Spook Rock Golf Course | 226 Spook Rock Road | 20 Level 2 | VIALYNK | 24 hours daily |
| 34 N Airmont Rd - Tesla Destination | 34 N Airmont Rd | 14 Level 2 | Tesla Destination | 24 hours daily. Open to all vehicles. |
| Indian Rock Shopping Center - Tesla Destination | 1 Indian Rock | 10 Level 2 | Tesla Destination | 24 hours daily. Open to all vehicles. |
| DPW Highway Department Town of Ramapo | 16 Pioneer Ave | 8 Level 2 | VIALYNK | 24 hours daily |
| EXECUTIVE PARK #1 | 2 Executive Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| EXECUTIVE PARK #2 | 2 Executive Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| EXECUTIVE PARK #3 | 2 Executive Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| EXECUTIVE PARK #4 | 2 Executive Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MONTEBELLO VILLAGE HALL 1 | 1 Montebello Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SHELDON SUFFERN ORANGE APT 2 | 128 Orange Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SHELDON SUFFERN ORANGE AV APT 1 | 128 Orange Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.