EV charger installers in Red Hook, NY
0 licensed installers based in Red Hook.
What it really costs in Red Hook
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Red Hook
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Public EV charging in Red Hook
Loading map…
16 public charging stations in Red Hook: 22 Level 2 ports and 10 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Red Hook, NY - Tesla Supercharger | 35 Hannaford Drive | 8 fast | Tesla | 24 hours daily. Open to all vehicles. |
| TOWN OF RED HK FAST 1 | 7336 S Broadway | 1 fast | ChargePoint Network | 24 hours daily |
| TOWN OF RED HK FAST 2 | 7336 S Broadway | 1 fast | ChargePoint Network | 24 hours daily |
| GREIG FARM GREIG FARM 1 | 227 Pitcher Ln | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GREIG FARM GREIG FARM 2 | 227 Pitcher Ln | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RED HOOK V. RED HOOK | 7477 S Broadway | 2 Level 2 | ChargePoint Network | 24 hours daily |
| REDHOOK-RETAIL REDHOOK 1 | 7568 North Broadway | 2 Level 2 | ChargePoint Network | 24 hours daily |
| TOWN OF MILAN TOWNHALL | 20 Wilcox Cir | 2 Level 2 | ChargePoint Network | 24 hours daily |
| TOWN OF RED HK RED HOOK 1 | 7336 S Broadway | 2 Level 2 | ChargePoint Network | 24 hours daily |
| TOWN OF RED HK RED HOOK 2 | 7336 S Broadway | 2 Level 2 | ChargePoint Network | 24 hours daily |
| TOWN OF RED HK REDHOOK 3 | 7336 S Broadway | 2 Level 2 | ChargePoint Network | 24 hours daily |
| TOWN OF RED HK REDHOOK 4 | 7336 S Broadway | 2 Level 2 | ChargePoint Network | 24 hours daily |
| IKEA USA BROOKLYN 1 | 1 Beard St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| IKEA USA BROOKLYN 2 | 1 Beard St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| IKEA USA BROOKLYN 3 | 1 Beard St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| IKEA USA BROOKLYN 4 | 1 Beard St | 1 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.