EV charger installers in Poughkeepsie, NY
1 licensed installer based in Poughkeepsie.
What it really costs in Poughkeepsie
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Poughkeepsie
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Public EV charging in Poughkeepsie
Loading map…
51 public charging stations in Poughkeepsie: 149 Level 2 ports and 24 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Healey Chevrolet Inc. | 1960 South Rd | 6 fast, 2 Level 2 | CHARGESMART_EV | 24 hours daily |
| Healey Ford - Poughkeepsie | 2250 South Road | 6 fast, 2 Level 2 | CHARGESMART_EV | 24 hours daily |
| 825 Main St | 825 Main St | 4 fast | RED_E | |
| BMW Hudson Valley | 960 South Rd | 4 fast | CHARGESMART_EV | 24 hours daily |
| GM - HUDSON CADILLAC - Poughkeepsie | 2023 South Road | 3 fast, 1 Level 2 | EV Connect | 24 hours daily |
| BMWHV HV FAST CHARGER | 2066-20 South Rd | 1 fast | ChargePoint Network | 24 hours daily |
| ShopRite Plaza | 3532 North Rd | 12 Level 2 | VIALYNK | 24 hours daily |
| Poughkeepsie - Town Hall | 1 Overocker Road | 10 Level 2 | FLO | 24 hours daily |
| The Arlington | 17 Anya Court | 9 Level 2 | EVGATEWAY | 24 hours daily |
| 20 Oneil Ct | 20 Oneil Ct Poughkeepsie, NY 12601 | 8 Level 2 | SYNERGEV | 24 hours daily |
| Village Crest Apartments - East | 510 Maloney Road | 8 Level 2 | VIALYNK | 24 hours daily |
| Village Crest Apartments - North | 510 Maloney Road | 8 Level 2 | VIALYNK | 24 hours daily |
| Village Crest Apartments - West | 510 Maloney Road | 8 Level 2 | VIALYNK | 24 hours daily |
| BP3 Springside Development | 44 Springside Avenue | 5 Level 2 | CHARGESMART_EV | 24 hours daily |
| Mid-Hudson Library System | 103 Market St | 4 Level 2 | VIALYNK | 24 hours daily |
| Scenic Hudson - 55 Parker Avenue | 55 Parker Avenue | 4 Level 2 | EV Connect | Sat: 12:00am-12:00am; Sun: 12:00am-12:00am |
| 45 Eastdale Ave | 45 Eastdale Ave | 3 Level 2 | EV Connect | 24 hours daily |
| BMWHV LEVEL TWO | 2066-20 South Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BMWHV SHOP STATION | 2068 South Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DUTCHESS CARS LEVEL 2 CHARGER | 2285 South Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Dutchess County Office Building | 22 Market St | 2 Level 2 | VIALYNK | 24 hours daily |
| HOTEL INN AT THE FALL | 50 Red Oaks Mill Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HYATT POUGHKEPS HYATT POUGHKEPS | 2165 South Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| McDonalds #39698 | 2585 South Road | 2 Level 2 | Blink Network | 24 hours daily |
| OAKWOOD FRIENDS OAKWOODFRIENDS1 | 22 Spackenkill Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 51.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.