EV charger installers in Copiague, NY
0 licensed installers based in Copiague.
What it really costs in Copiague
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Copiague
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Public EV charging in Copiague
Loading map…
4 public charging stations in Copiague: 4 Level 2 ports and 12 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Copiague, NY - Tesla Supercharger | 1147 Sunrise Highway | 8 fast | Tesla | 24 hours daily. NACS partner enabled. |
| EVolve NY Copiague | 1149 Sunrise Hwy | 4 fast | Electrify America | 24 hours daily |
| COPIAGUELIBRARY COPIAGUE LIB1 | 50 Deauville Boulevard | 2 Level 2 | ChargePoint Network | Mon: 8:00am-8:45pm; Tue: 8:00am-8:45pm; Wed: 8:00am-8:45pm; Thu: 8:00am-8:45pm; Fri: 8:00am-8:45pm; Sat: 9:00am-4:45pm |
| COPIAGUELIBRARY COPIAGUE LIB2 | 50 Deauville Boulevard | 2 Level 2 | ChargePoint Network | Mon: 8:00am-8:45pm; Tue: 8:00am-8:45pm; Wed: 8:00am-8:45pm; Thu: 8:00am-8:45pm; Fri: 8:00am-8:45pm; Sat: 9:00am-4:45pm |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.