EV charger installers in Brockport, NY

0 licensed installers based in Brockport.

What it really costs in Brockport

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Brockport

We haven't found a program specific to this area yet. Statewide programs are on the state page.

EV charger installers

No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.

Public EV charging in Brockport

Loading map…

10 public charging stations in Brockport: 59 Level 2 ports.

StationAddressPortsNetworkHours
Autumn Woods151 Sunset Center Ln35 Level 2EVIUM24 hours daily
Brockport Landing18 N Main St8 Level 2VIALYNK24 hours daily
COLL BROCKPORT ALLEN LOOP350 New Campus Dr2 Level 2ChargePoint NetworkMon: 12:00am-11:59pm; Tue: 12:00am-11:59pm; Wed: 12:00am-11:59pm; Thu: 12:00am-11:59pm; Fri: 12:00am-11:59pm; Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm
COLL BROCKPORT FINEARTS LOT G1168 Holley St2 Level 2ChargePoint NetworkMon: 12:00am-11:59pm; Tue: 12:00am-11:59pm; Wed: 12:00am-11:59pm; Thu: 12:00am-11:59pm; Fri: 12:00am-11:59pm; Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm
COLL BROCKPORT HARTWELL LOT N75 College St2 Level 2ChargePoint NetworkMon: 12:00am-11:59pm; Tue: 12:00am-11:59pm; Wed: 12:00am-11:59pm; Thu: 12:00am-11:59pm; Fri: 12:00am-11:59pm; Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm
COLL BROCKPORT SERC LOT V321 New Campus Dr2 Level 2ChargePoint NetworkMon: 12:00am-11:59pm; Tue: 12:00am-11:59pm; Wed: 12:00am-11:59pm; Thu: 12:00am-11:59pm; Fri: 12:00am-11:59pm; Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm
COLL BROCKPORT UNION LOTO101 Residence Dr2 Level 2ChargePoint NetworkMon: 12:00am-11:59pm; Tue: 12:00am-11:59pm; Wed: 12:00am-11:59pm; Thu: 12:00am-11:59pm; Fri: 12:00am-11:59pm; Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm
HOTEL LOCATION BEST WESTERN 14908 Lake Rd S2 Level 2ChargePoint Network24 hours daily
VILLAGE HALL STATION49 State St2 Level 2ChargePoint Network24 hours daily
VILLAGE HALL WELCOME CENTER12-40 Water St2 Level 2ChargePoint Network24 hours daily

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.