Atlantic City Electric EVsmart Residential Make-Ready Rebate
50% of electrical upgrade costs, up to $1,000
Up to $1,000 in rebates from 2 programs. 12 licensed installers based in Sicklerville.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,000), a typical job could cost you as little as $900.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
50% of electrical upgrade costs, up to $1,000
Loading map…
5 public charging stations in Sicklerville: 6 Level 2 ports and 5 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Target T2181 (Sicklerville, NJ) | 487 Cross Keys Rd | 4 fast | Electrify America | 24 hours daily |
| TOYOTA 1 SERVICECPE250 1 | 3108 E Black Horse Pike | 1 fast | ChargePoint Network | 24 hours daily |
| CAMDEN COUNTY VOTECH PS1 | 343 Berlin - Cross Keys Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CAMDEN COUNTY VOTECH PS2 | 343 Berlin - Cross Keys Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| TOYOTA 1 SALES CT4K 1 | 3108 E Black Horse Pike | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.