Rockland Electric New Jersey Charger Ready for Home
50% of make-ready customer sided costs, up to $1000 + 100% of make-ready utility sided costs, up to $5000, capped at 90% of total project cost
Up to $6,000 in rebates from 2 programs. 3 licensed installers based in Montvale.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($6,000), a typical job could cost you as little as $0.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
50% of make-ready customer sided costs, up to $1000 + 100% of make-ready utility sided costs, up to $5000, capped at 90% of total project cost
Loading map…
17 public charging stations in Montvale: 46 Level 2 ports and 8 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| James Gandolfini Service Area | 172 Gardon State Pkwy MM 172 | 4 fast | APPLEGREEN | 24 hours daily |
| Montvale PD | 12 Depiero Dr | 4 fast | VIALYNK | 24 hours daily |
| 155 Chestnut Ridge | 155 Chestnut Ridge Rd | 11 Level 2 | EVGATEWAY | 24 hours daily |
| QFS - 180 Summit | 180 Summit Ave | 9 Level 2 | SWTCH | 24 hours daily |
| MB4 CT4K STATION 1 | 400 Market Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MB4 CT4K STATION 2 | 400 Market Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MB4 CT4K STATION 3 | 400 Market St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MB4 CT4K STATION 4 | 400 Market Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MB4 CT4K STATION 5 | 400 Market St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MB4 CT4K STATION 6 | 400 Market St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MB4 CT4K STATION 7 | 400 Market St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MDA II PHILLIPS STATION 1 | 34 Philips Pkwy | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MDA II PHILLIPS STATION 2 | 32 Philips Pkwy | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MDA II PHILLIPS STATION 4 | 34 Philips Pkwy | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MONTVALE DEV WEGMANS | 300 W Grand Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MONTVALE MB II STATION 1 | 200 Market St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MONTVALE MB II STATION 2 | 200 Market St | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.