EV charger installers in Matawan, NJ
Up to $250 in rebates from 1 program. 18 licensed installers based in Matawan.
What it really costs in Matawan
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($250), a typical job could cost you as little as $1,650.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Matawan
EV charger installers
Apex Electrical Contracting LLC
Matawan, 07747Balaji Electricals LLC
Matawan, 07747Pallas Electr Contrs
Matawan, 07747A K Electric INC
Matawan, 07747Aurora Electric Company LLC
Matawan, 07747Bocchieri Electric LLC
Matawan, 07747Ck Electric Corp
Matawan, 07747Contractors Continuing Education Solutions LLC
Matawan, 07747Dan-bree Electr Contrs INC
Matawan, 07747G-crew LLC
Matawan, 07747High Voltage Elec INC
Matawan, 07747J Grausso Electrical Contractor
Matawan, 07747Show all 18 installers
- J Kowalski Electrical Contractor
- M&m Energy Solutions, INC.
- NJ Electric Professionals LLC
- Power Source Electric Of NJ LLC
- R K Electric Co
- Rhw Electric LLC
Public EV charging in Matawan
Loading map…
5 public charging stations in Matawan: 20 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| 41 Atlantic Ave - Tesla Destination | 41 ATLANTIC AVE | 12 Level 2 | Tesla Destination | 24 hours daily. Open to all vehicles. |
| BNE MASTER LINK 2 | 1101 Schindler | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MATAWAN MATAWAN | 558 Lloyd Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| NJDEP STATEPARK CHEESEQUAKE PS1 | Cheesequake State Park 300 Gordon Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| NJDEP STATEPARK CHEESEQUAKE PS2 | Cheesequake State Park 300 Gordon Rd. | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.