Rockland Electric New Jersey Charger Ready for Home
50% of make-ready customer sided costs, up to $1000 + 100% of make-ready utility sided costs, up to $5000, capped at 90% of total project cost
Up to $6,000 in rebates from 2 programs. 24 licensed installers based in Mahwah.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($6,000), a typical job could cost you as little as $0.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
50% of make-ready customer sided costs, up to $1000 + 100% of make-ready utility sided costs, up to $5000, capped at 90% of total project cost
Loading map…
40 public charging stations in Mahwah: 77 Level 2 ports and 25 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Mahwah, NJ - Tesla Supercharger | 280 NJ-17 | 8 fast | Tesla | 24 hours daily. Open to all vehicles. |
| Mahwah Ford | 55 Franklin Turnpike | 6 fast, 6 Level 2 | CHARGESMART_EV | 24 hours daily |
| Honda of Mahwah Sales | 345 New Jersey 17 | 2 fast, 3 Level 2 | Blink Network | 24 hours daily |
| Cadillac Of Mahwah | 319 ROUTE 17 NORTH | 2 fast | EV Connect | 24 hours daily |
| JLR MAHWAH DCFAST 04 | 100 Jaguar Land Rover Way | 1 fast | ChargePoint Network | 24 hours daily |
| JLR MAHWAH DCFAST 05 | 100 Jaguar Land Rover Way | 1 fast | ChargePoint Network | 24 hours daily |
| JLR MAHWAH DCFAST 07 | 100 Jaguar Land Rover Way | 1 fast | ChargePoint Network | 24 hours daily |
| JLR MAHWAH DCFAST 08 | 100 Jaguar Land Rover Way | 1 fast | ChargePoint Network | 24 hours daily |
| JLR MAHWAH DCFAST 1 | 100 Jaguar Land Rover Way | 1 fast | ChargePoint Network | 24 hours daily |
| JLR MAHWAH DCFAST 2 | 100 Jaguar Land Rover Way | 1 fast | ChargePoint Network | 24 hours daily |
| LIBERTY HYUNDAI FAST 2 | 305 New Jersey 17 | 1 fast | ChargePoint Network | 24 hours daily |
| 1200 MacArthur Blvd Poweral | 1200 MacArthur Blvd | 12 Level 2 | RED_E | |
| Honda of Mahwah Service | 99 Franklin Turnpike | 3 Level 2 | Blink Network | 24 hours daily |
| MAHWAH A-AC-1 | 1800 Volvo Pl | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MAHWAH A-AC-10 | 933 MacArthur Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MAHWAH A-AC-11 | 933 MacArthur Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MAHWAH A-AC-12 | 933 MacArthur Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MAHWAH A-AC-13 | 933 MacArthur Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MAHWAH A-AC-14 | 933 MacArthur Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MAHWAH A-AC-15 | 933 MacArthur Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MAHWAH A-AC-16 | 933 MacArthur Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MAHWAH A-AC-17 | 933 MacArthur Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MAHWAH A-AC-18 | 933 MacArthur Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MAHWAH A-AC-19 | 933 MacArthur Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MAHWAH A-AC-2 | 1800 Volvo Pl | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 40.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.