PSE&G EV Residential Charging Program - Make-Ready incentive
Up to $1,500 on-bill credit per charger for customer-side wiring; up to $5,000 reduction of any utility-side deposit
Up to $1,500 in rebates from 2 programs. 5 licensed installers based in Iselin.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $1,500 on-bill credit per charger for customer-side wiring; up to $5,000 reduction of any utility-side deposit
Loading map…
15 public charging stations in Iselin: 27 Level 2 ports and 2 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| WOODBRIDGE TWP DCFC ISELIN (1) | 275 NJ-27 | 1 fast | ChargePoint Network | 24 hours daily |
| WOODBRIDGE TWP DCFC ISELIN (2) | 275 NJ-27 | 1 fast | ChargePoint Network | 24 hours daily |
| 194 Wood Ave S | 194 S Wood Ave | 8 Level 2 | VIALYNK | 24 hours daily |
| Garden Homes - Metro Park Associates | 33 S Wood Ave | 6 Level 2 | OpConnect | 24 hours daily |
| BUILDING 4 BUILDING 4 | 3 Ronson Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| METROPARK EV 2 | 33 S Wood Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BUILDING 4 STATION 1A | 3 Ronson Rd | 1 Level 2 | ChargePoint Network | 24 hours daily |
| BUILDING 4 STATION 1B | 3 Ronson Rd | 1 Level 2 | ChargePoint Network | 24 hours daily |
| BUILDING 4 STATION 2 | 3 Ronson Rd | 1 Level 2 | ChargePoint Network | 24 hours daily |
| BUILDING 4 STATION 2B | 3 Ronson Rd | 1 Level 2 | ChargePoint Network | 24 hours daily |
| BUILDING 4 STATION 3A | 3 Ronson Rd | 1 Level 2 | ChargePoint Network | 24 hours daily |
| BUILDING 4 STATION 3B | 3 Ronson Rd | 1 Level 2 | ChargePoint Network | 24 hours daily |
| BUILDING 4 STATION 4A | 1500 Ronson Rd | 1 Level 2 | ChargePoint Network | 24 hours daily |
| BUILDING 4 STATION 4B | 3 Ronson Rd | 1 Level 2 | ChargePoint Network | 24 hours daily |
| P1607 | 799 US-1 | 1 Level 2 | SWTCH | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.