PSE&G EV Residential Charging Program - Make-Ready incentive
Up to $1,500 on-bill credit per charger for customer-side wiring; up to $5,000 reduction of any utility-side deposit
Up to $1,500 in rebates from 2 programs. 3 licensed installers based in Hoboken.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $1,500 on-bill credit per charger for customer-side wiring; up to $5,000 reduction of any utility-side deposit
Loading map…
26 public charging stations in Hoboken: 42 Level 2 ports and 2 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| DT&P HOBOKEN DC1 | 415 Newark St. | 1 fast | ChargePoint Network | 24 hours daily |
| DT&P HOBOKEN DC2 | 415 Newark St. | 1 fast | ChargePoint Network | 24 hours daily |
| Littleman Parking 2 12th Street - Tesla Destination | 2 12th St. | 4 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| Littleman Parking 2 14th Street - Tesla Destination | 2 14th St | 4 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| DT&P 1301 JEFFERSON | 1313 Jefferson St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DT&P 1ST & WASH PS1 | 68 1st St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DT&P GARAGE B ST 3 | 28 2nd St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DT&P GARAGE B ST1 | 28 2nd St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DT&P GARAGE B ST2 | 28 2nd St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DT&P GARAGE D ST1 | 215 Hudson St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DT&P GARAGE D ST2 | 215 Hudson St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DT&P GARAGE D ST3 | 215 Hudson St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DT&P MIDTOWN GAR PS1 | 326 Clinton St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DT&P MIDTOWN GAR PS2 | 326 Clinton St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DT&P MIDTOWN GAR PS3 | 326 Clinton St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| W Hoboken - Tesla Destination | 225 River St | 2 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| 205 MADISON 1 | 205 Madison St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| 205 MADISON 2 | 205 Madison St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| 205 MADISON 3 | 205 Madison St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| 205 MADISON 4 | 205 Madison St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| 303 MADISON ST ST 1 | 303 Madison St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| 303 MADISON ST ST 2 | 303 Madison St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| 303 MADISON ST ST 3 | 303 Madison St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| 303 MADISON ST ST 4 | 303 Madison St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| Avalon Hoboken | 800 Madison St | 1 Level 2 | LOOP | 24 hours daily |
Showing 25 of 26.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.