PSE&G EV Residential Charging Program - Make-Ready incentive
Up to $1,500 on-bill credit per charger for customer-side wiring; up to $5,000 reduction of any utility-side deposit
Up to $1,500 in rebates from 2 programs. 44 licensed installers based in Clifton.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $1,500 on-bill credit per charger for customer-side wiring; up to $5,000 reduction of any utility-side deposit
Loading map…
5 public charging stations in Clifton: 19 Level 2 ports and 10 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Target T1822 (Clifton, NJ) | 30 Kingsland Rd | 6 fast | Electrify America | 24 hours daily |
| Fette Ford | 1137 US-46 | 4 fast, 4 Level 2 | CHARGESMART_EV | Mon: 9:00am-7:00pm; Tue: 9:00am-7:00pm; Wed: 9:00am-7:00pm; Thu: 9:00am-7:00pm; Fri: 9:00am-7:00pm; Sat: 9:00am-7:00pm |
| Robert Treat Hotel - Tesla Destination | 50 Park Plz | 8 Level 2 | Tesla Destination | 24 hours daily. Open to all vehicles. |
| Spark Hotel | 680 NJ-3 | 6 Level 2 | VIALYNK | 24 hours daily |
| Fette Kia | 1137 US-46 | 1 Level 2 | Non-Networked | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.