Xcel Energy (Minnesota) - EV home charging wiring rebate
Up to $500 toward wiring for a Level 2 home charger; up to $1,300 for income-qualified customers.
Up to $1,300 in rebates from 1 program. 11 licensed installers based in Winona.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,300), a typical job could cost you as little as $600.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $500 toward wiring for a Level 2 home charger; up to $1,300 for income-qualified customers.
Loading map…
8 public charging stations in Winona: 15 Level 2 ports and 3 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| WSU - Integrated Wellness Complex | 118 West Mark Street | 2 fast, 4 Level 2 | ZEFNET | |
| GM - Dahl Chevrolet Buick GMC | 1201 US-61 | 1 fast | EV Connect | 24 hours daily |
| DAHLAUTO- TOYSALES-CT4000 | 1077 W Service Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Dahl Chevrolet Buick GMC | 1201 US-61 | 2 Level 2 | Non-Networked | 24 hours daily |
| Sugar Loaf CDJR | 1244 West Service Drive | 2 Level 2 | Blink Network | 24 hours daily |
| Sugar Loaf Ford | 1222 West Service Drive | 2 Level 2 | Blink Network | 24 hours daily |
| WSU - Kryzsko Commons | 250 West 10th Street | 2 Level 2 | ZEFNET | |
| Bluff Country Co-op | 121 W 2nd St | 1 Level 2 | Non-Networked | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.