EV charger installers in Morris, MN
3 licensed installers based in Morris.
What it really costs in Morris
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Morris
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Wehking Electric INC
Morris, 56267Tom Kieffer & Sons Electric INC
Morris, 56267Public EV charging in Morris
Loading map…
5 public charging stations in Morris: 5 Level 2 ports and 7 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Morris | 24 E 7th St, | 4 fast, 1 Level 2 | CHARGELAB | |
| Heartland Motor Co | 1 E Highway 28 | 2 fast | IN_CHARGE | 8am-7pm M-Th, 8am-6pm F, 8am-4pm Sat |
| University of Minnesota - Morris | 46352 MN-329 | 1 fast, 1 Level 2 | Non-Networked | 24 hours daily |
| U OF M - MORRIS MORRIS 001 | Alumni Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Willie’s SuperValu | 25 E 7th St | 1 Level 2 | Non-Networked | 7am-9pm daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.