EV charger installers in Litchfield, MN
8 licensed installers based in Litchfield.
What it really costs in Litchfield
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Litchfield
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
D&f Electric INC
Litchfield, 55355Mid Minnesota Electric LLC
Litchfield, 55355Meeker Cooperative Light & Power Association
Litchfield, 55355Crow River Electric LLC
Litchfield, 55355Thelen Unlimited LLC
Litchfield, 55355Absolute Electrical LLC
Litchfield, 55355Public EV charging in Litchfield
Loading map…
3 public charging stations in Litchfield: 10 Level 2 ports and 4 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| City of Litchfield Central Park | 20 East 4th Street | 4 fast, 2 Level 2 | ZEFNET | |
| City of Litchfield Memorial Park | NaN null Lake Ripley Drive | 6 Level 2 | ZEFNET | |
| City of Litchfield City Hall | 126 North Marshall Avenue | 2 Level 2 | ZEFNET |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.