EV charger installers in Forest Lake, MN

15 licensed installers based in Forest Lake.

What it really costs in Forest Lake

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Forest Lake

We haven't found a program specific to this area yet. Statewide programs are on the state page.

EV charger installers

Show all 15 installers

Public EV charging in Forest Lake

Loading map…

5 public charging stations in Forest Lake: 6 Level 2 ports and 9 DC fast ports.

StationAddressPortsNetworkHours
Forest Lake Ford508 15th St SW4 fast, 2 Level 2RED_E
Kwik Trip #4294868 208th St N4 fastKWIK_CHARGE24 hours daily
Whitaker Buick GMC131 19th Street SW1 fastEV Connect24 hours daily
FOREST LAKE SER FOR SVR 119955 Forest Rd N2 Level 2ChargePoint Network24 hours daily
FOREST LAKE SER FOR SVR 219955 Forest Rd N2 Level 2ChargePoint Network24 hours daily

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.