EV charger installers in Detroit Lakes, MN

14 licensed installers based in Detroit Lakes.

What it really costs in Detroit Lakes

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Detroit Lakes

We haven't found a program specific to this area yet. Statewide programs are on the state page.

EV charger installers

Show all 14 installers

Public EV charging in Detroit Lakes

Loading map…

4 public charging stations in Detroit Lakes: 5 Level 2 ports and 4 DC fast ports.

StationAddressPortsNetworkHours
City Of Detroit Lakes200 Holmes Street East2 fast, 2 Level 2ZEFNET
Webber Family Motors1389 Wenner Road2 fastBlink Network24 hours daily
DETROIT LAKES HEARTLAND 21320 U.S. 10E2 Level 2ChargePoint Network24 hours daily
DETROIT LAKES HEARTLAND 11320 US Hwy 10E1 Level 2ChargePoint Network24 hours daily

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.