Eversource Massachusetts - home EV charger rebate
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
1 rebate program available. 0 licensed installers based in Woburn.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
35 public charging stations in Woburn: 152 Level 2 ports and 13 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Woburn, MA - Tesla Supercharger | 101 Commerce Way | 12 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Kelly Nissan | 95 Cedar St | 1 fast, 3 Level 2 | Non-Networked | Dealership business hours |
| Cummings Center | 100 Cummings Center | 30 Level 2 | Non-Networked | 24 hours daily |
| MassDEP Northeast Regional Office | 150 Presidential Way | 16 Level 2 | Non-Networked | Business hours |
| Mill Street Heights | 57 Mill Street | 10 Level 2 | FLO | 24 hours daily |
| Chomerics Headquarters | 77 Dragon Court | 8 Level 2 | ZEFNET | |
| State St Woburn | 10 State St | 8 Level 2 | FLO | 24 hours daily |
| 12 Cabot | 12 Cabot Rd | 6 Level 2 | Non-Networked | 24 hours daily |
| 2 CP | 52 Cummings Park | 6 Level 2 | Non-Networked | 24 hours daily |
| 34 Commerce | 34 Commerce Way | 6 Level 2 | Non-Networked | 24 hours daily |
| 600 WCP | 600 W Cummings Park | 6 Level 2 | Non-Networked | 24 hours daily |
| 21-23 Warren Ave | 21-23 Warren Ave | 4 Level 2 | Non-Networked | 24 hours daily |
| J Woburn Heights | 1042 Main Street | 4 Level 2 | Blink Network | 24 hours daily |
| Nardone Electrical Corporation - Parking 1-1 | 160 Olympia Ave | 4 Level 2 | FLO | 24 hours daily |
| 01 BLD 300 300UP EV CHARGE | 300 Unicorn Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 120PW CHARGE PORT 1-2 | 120 Presidential Way | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 120PW CHARGE PORT 15-16 | 120 Presidential Way | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 120PW CHARGE PORT 5-6 | 120 Presidential Way | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 120PW CHARGE PORT 9-10 | 120 Presidential Way | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 150PW CHARGE PORT 11-12 | 150 Presidential Way | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 150PW CHARGE PORT 13-14 | 150 Presidential Way | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 150PW CHARGE PORT 3-4 | 150 Presidential Way | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 150PW CHARGE PORT 7-8 | 150 Presidential Way | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 304 CAMBRIDGE STATION 1 | 304 Cambridge Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| ALEX AUTO STATION 1 | 505 Main Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 35.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.