Eversource Massachusetts - home EV charger rebate
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
1 rebate program available. 0 licensed installers based in West Springfield.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
20 public charging stations in West Springfield: 25 Level 2 ports and 13 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| West Springfield, MA - Tesla Supercharger | 935 Riverdale Street | 8 fast | Tesla | 24 hours daily. Open to Teslas only. |
| Bertera CDJR - DCFC | 657 Riverdale Street | 2 fast | Blink Network | 24 hours daily |
| CUMB FARMS EV POINT 6730 | 143 Park Ave | 1 fast | ChargePoint Network | 24 hours daily |
| GPM INVESTMENTS 624 DC1 | 1247 Riverdale Street | 1 fast | ChargePoint Network | 24 hours daily |
| GPM INVESTMENTS 624 DC2 | 1247 Riverdale Street | 1 fast | ChargePoint Network | 24 hours daily |
| 1025 TREE HOUSE 1 | 1025 Westfield St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 1025 TREE HOUSE 2 | Westfield / Silver (2) | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 1150EVCHARGE 1150 STATION 1 | 1150a Union St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 1150EVCHARGE 1150 STATION 2 | 1150a Union St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AAA West Springfield | 150 Capital Drive | 2 Level 2 | Blink Network | 24 hours daily |
| BIG Y FOODS W.SPRINGFIELD 1 | 500 Memorial Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BIG Y FOODS W.SPRINGFIELD 2 | 500 Memorial Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Bertera CDJR | 657 Riverdale Street | 2 Level 2 | Blink Network | 24 hours daily |
| PEOPLESBANK 547 MEMORIAL | 547 Memorial Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Site 624 Pride West Springfield Riverdale St | 1247 Riverdale St | 2 Level 2 | RED_E | |
| F&S VOLVO C SERVICE BAY 1 | 989 Memorial Ave | 1 Level 2 | ChargePoint Network | 24 hours daily |
| WS COA STATION 1 | 26 Central Street | 1 Level 2 | ChargePoint Network | 24 hours daily |
| WS COA STATION 2 | 26 Central Street | 1 Level 2 | ChargePoint Network | 24 hours daily |
| WS COA STATION 3 | 26 Central Street | 1 Level 2 | ChargePoint Network | 24 hours daily |
| WS COA STATION 4 | 44 Van Deene Avenue | 1 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.