Eversource Massachusetts - home EV charger rebate
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
1 rebate program available. 0 licensed installers based in Springfield.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
82 public charging stations in Springfield: 235 Level 2 ports and 6 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| GPM INVESTMENTS 622 DC1 | 1211 E Columbus Ave | 1 fast | ChargePoint Network | 24 hours daily |
| GPM INVESTMENTS 622 DC2 | 1211 E Columbus Ave | 1 fast | ChargePoint Network | 24 hours daily |
| GPM INVESTMENTS 629 DC1 | 77 West Street | 1 fast | ChargePoint Network | 24 hours daily |
| GPM INVESTMENTS 629 DC2 | 77 West Street | 1 fast | ChargePoint Network | 24 hours daily |
| SERVICEDRIVE UNIT 1 | 683 East Columbus Avenue | 1 fast | ChargePoint Network | 24 hours daily |
| SERVICEDRIVE UNIT 2 | 683 East Columbus Avenue | 1 fast | ChargePoint Network | 24 hours daily |
| Springfield College | 263 Alden St | 20 Level 2 | AMPUP | Contact site for information |
| Tower Square Garage | 1500 Main Street | 12 Level 2 | FLO | 24 hours daily |
| 700 State St | 700 State St | 10 Level 2 | AMPUP | Contact station for hours of availability. |
| Heliovaas | 395 Liberty St | 10 Level 2 | AMPUP | Contact station for hours of availability. |
| Hampton Inn & Suites Springfield/Downtown | 851 E Columbus Ave. | 8 Level 2 | FLO | 24 hours daily |
| MGM Floor 3 | 1 MGM Way | 8 Level 2 | AMPUP | 24 hours daily |
| MGM Floor 4 | 1 MGM Way | 8 Level 2 | AMPUP | 24 hours daily |
| MGM Floor 5 | 1 MGM Way | 8 Level 2 | AMPUP | 24 hours daily |
| MGM Floor 7 | 1 MGM Way | 7 Level 2 | AMPUP | 24 hours daily |
| Monarch Place - Sheraton | 1 Monarch Pl | 6 Level 2 | AMPUP | Contact station for hours of availability |
| Propark - Worthington | 215 Worthington St | 6 Level 2 | AMPUP | 24 hours daily |
| MGM Floor 6 | 1 MGM Way | 4 Level 2 | AMPUP | 24 hours daily |
| Springfield Lodge of Elk #61 | 440 Tiffany Street | 4 Level 2 | FLO | 24 hours daily |
| Springfield Technical Community College Lot A | 1 Armory Sq | 4 Level 2 | Non-Networked | College hours |
| AEG AEG / CHESTNUT | 355Plainfield St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AEG BRIGHTWOOD #1 | 320 Plainfield St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AEG BRIGHTWOOD #2 | 320 Plainfield St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AEG GREENLEAF | Parker / Wilbraham | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AEG SPRINGFIELD DPW | 70 Tapley St | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 82.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.