Eversource Massachusetts - home EV charger rebate
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
1 rebate program available. 0 licensed installers based in Greenfield.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
28 public charging stations in Greenfield: 54 Level 2 ports and 7 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Ford of Greenfield | 1 Main Street | 4 fast, 5 Level 2 | Blink Network | 24 hours daily |
| Big Y | 237 Mohawk Trail | 1 fast, 1 Level 2 | Non-Networked | 24 hours daily |
| BIG Y FOODS MOHAWK TRAIL #1 | 249a Mohawk Trail | 1 fast | ChargePoint Network | 24 hours daily |
| GREENFIELD TOY TOYOTA OF GFLD | 1 Main St | 1 fast | ChargePoint Network | 24 hours daily |
| Franklin County Sheriff's Office | 160 Elm St | 4 Level 2 | Non-Networked | 24 hours daily |
| BH BFMC LOWER 1 | 164 High Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BH BFMC LOWER 2 | 164 High Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BH BFMC SAND. 1 | 48 Sanderson Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BH BFMC UPPER 1 | 164 High Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BH BFMC UPPER 2 | 164 High Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Chapman Davis Parking Lot | 51 Chapman St | 2 Level 2 | Non-Networked | 24 hours daily |
| GREENFIELDMA CHAPMAN DAVIS | 13-25 Chapman St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GREENFIELDMA CITY HALL LOT | 14 Court Square | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GREENFIELDMA FIRE STATION | 41 Main St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GREENFIELDMA LIBRARY LOT 1 | 412 Main St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GREENFIELDMA LIBRARY LOT 2 | 412 Main St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GREENFIELDMA OLIVE ST 01 | 11 Olive St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GREENFIELDMA OLIVE ST 03 | 11 Olive St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GREENFIELDMA OLIVE ST 04 | 11 Olive St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Greenfield City Hall | 14 Court Square | 2 Level 2 | Non-Networked | 24 hours daily |
| LEYDEN 1 TOWN HALL ST #1 | 7 Brattleboro Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MASSDOT GREENFIELD 1 | 18 Miner St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MASSDOT GREENFIELD 2 | 18 Miner St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Thunderbird Hospitality | 21 Colrain Rd | 2 Level 2 | FLO | 24 hours daily |
| ZS CHARGERS ZS EV1 | 176 Federal St | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 28.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.