National Grid Massachusetts - home EV charging program
Rebate toward a Level 2 home charger and installation with off-peak charging enrollment.
1 rebate program available. 0 licensed installers based in Great Barrington.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a Level 2 home charger and installation with off-peak charging enrollment.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
10 public charging stations in Great Barrington: 18 Level 2 ports and 20 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Great Barrington, MA - Tesla Supercharger | 700 Main Street Route 7 | 8 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Bard College Daniel Arts Center | 84 Alford Rd | 6 fast | RED_E | |
| Goldman Group | 148 Maple Ave | 6 fast | RED_E | |
| Berkshire South Regional Community Center | 15 Crissey Rd | 4 Level 2 | QUICKCHARGE | 24 hours daily |
| Fairfield Inn | 249 Stockbridge Rd | 4 Level 2 | QUICKCHARGE | 7am-7pm daily |
| HOLIDAY INN GB HOLIDAY 1.2 | 415 Stockbridge Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOLIDAY INN GB HOLIDAY 1.3 | 415 Stockbridge Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOLIDAY INN GB HOLIDAY 1.4 | 415 Stockbridge Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOLIDAY INN GB HOLIDAY INN 1.1 | 415 Stockbridge Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| TGB TACONIC LOT TGB TACONIC LOT | 82 Railroad St | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.