Mass Save - income-eligible heat pump offers (includes federal HEAR funds)
Enhanced rebates up to $16,000 for moderate-income households, or no-cost heat pumps for income-eligible households.
Gardner gets its power from National Grid. Here's what you can claim and who can do the work.
Enhanced rebates up to $16,000 for moderate-income households, or no-cost heat pumps for income-eligible households.
Whole-home air-source heat pump rebate of $2,650 per ton, up to $8,500 per home; partial-home and heat pump water heater rebates also offered.
State income tax credit of 15% of the cost of a solar system on your home, up to $1,000.
Annual incentive of $275 per kW for their battery system's average performance between June 1 and September 30; on average, customers have received $1,200 per year.
Fixed per-kWh incentive paid by your utility for the solar power your system produces, for 10-20 years; rates depend on utility and capacity block.
Rebate toward a Level 2 home charger and installation with off-peak charging enrollment.
Loading map…
Gardner has 6.5 public charging ports per 10,000 residents, against 16.6 across Massachusetts. See how towns compare.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
8 public charging stations in Gardner: 8 Level 2 ports and 6 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| SALVADORE AUTO SALVADOR L3 B | 442 West Broadway | 2 fast | ChargePoint Network | 24 hours daily |
| SALVADORE AUTO SALVADORE L3 A | 442 West Broadway | 2 fast | ChargePoint Network | 24 hours daily |
| ENERGICA ROBS DYNO SERV | 45 Fredette Street | 1 fast | ChargePoint Network | 24 hours daily |
| NOURIA GARDNER 2 | 264 Timpany Boulevard | 1 fast | ChargePoint Network | 24 hours daily |
| Gardner Department of Public Works | 50 Manca Dr | 2 Level 2 | Non-Networked | M-F 8am-4pm |
| MT WACHUSETT CC MWCC STA 1 | 444 Green St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MT WACHUSETT CC MWCC STA 2 | 444 Green St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MT WACHUSETT CC MWCC STA 3 | 444 Green St | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.