Eversource Massachusetts - home EV charger rebate
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
1 rebate program available. 0 licensed installers based in Charlestown.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
32 public charging stations in Charlestown: 110 Level 2 ports and 6 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| MassPort TNC Lot (Ride App Staging Lot) | 1 Harborside Dr | 6 fast, 2 Level 2 | ChargePoint Network | 24 hours daily; drivers must obtain approval prior to charging |
| MGH Charlestown 199 Garage | 6 13th St | 32 Level 2 | Non-Networked | 24 hours daily; Enel X Way app |
| 420 Rutherford Ave | 420 Rutherford Ave | 13 Level 2 | LOOP | 24 hours daily |
| Flagship Wharf | 198 8th St | 6 Level 2 | AMPUP | Contact station for hours of availability |
| 1st Ave, Charlestown | 45 1st Ave | 4 Level 2 | FLO | 24 hours daily |
| BUNKER HILL CC 1 | 250 New Rutherford Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BUNKER HILL CC 2 | 250 New Rutherford Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BUNKER HILL CC 3 | 250 Rutherford Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BUNKER HILL CC 4 | 250 New Rutherford Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BUNKER HILL CC 5 | 250 New Rutherford Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P1 SPACE 101 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P1 SPACE 102 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P1 SPACE 103 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P1 SPACE 105 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P2 SPACE 201 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P2 SPACE 202 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P2 SPACE 203 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P2 SPACE 204 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P3 SPACE 301 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P3 SPACE 302 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P3 SPACE 303 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P3 SPACE 304 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P3 SPACE 305 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P4 SPACE 401 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HOOD PARK P4 SPACE 402 | 100 Hood Park Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 32.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.