National Grid Massachusetts - home EV charging program
Rebate toward a Level 2 home charger and installation with off-peak charging enrollment.
1 rebate program available. 0 licensed installers based in Bridgewater.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a Level 2 home charger and installation with off-peak charging enrollment.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
28 public charging stations in Bridgewater: 55 Level 2 ports and 18 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Valley Storage | 15 Whitman St East | 6 fast | RED_E | |
| Market Basket West Bridgewater #70 | 352 W Center St West | 4 fast | eVgo Network | 24 hours daily |
| Mechanics Co-op Bank Bridgewater | 72 Main St | 2 fast | AUTEL | 24 hours daily; for clients only |
| Mechanics Cooperative Bank Bridgewater | 72 Main Street | 2 fast | RED_E | |
| MASSDOT NBBRIDGEWATER L | Fall River Expy | 1 fast | ChargePoint Network | 24 hours daily |
| MASSDOT NBBRIDGEWATER R | Fall River Expy | 1 fast | ChargePoint Network | 24 hours daily |
| MASSDOT SBBRIDGEWATER L | MA-24 | 1 fast | ChargePoint Network | 24 hours daily |
| MASSDOT SBBRIDGEWATER R | Route 24 Southbound | 1 fast | ChargePoint Network | 24 hours daily |
| Bridgewater State University Dana Mohler-Faria Science & Mathematics Center | 24 Park Ave | 8 Level 2 | Non-Networked | University hours |
| Bridgewater State University Weygand Lot | 85 Burrill Ave | 6 Level 2 | Non-Networked | 24 hours daily |
| Bridgewater Town Hall | 66 Central Square | 4 Level 2 | Non-Networked | 24 hours daily |
| Mitchell Elementry School | 500 South Street | 4 Level 2 | FLO | 24 hours daily |
| Bridgewater State University Great Hill Drive Garage | Great Hill Dr | 3 Level 2 | Non-Networked | 24 hours daily |
| BSU BSUWEY UNIT 1 | 351 Great Hill Drive | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BSU BSUWEY UNIT 2 | 351 Great Hill Drive | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BSU BSUWEY UNIT 3 | 351 Great Hill Drive | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BSU DMF UNIT 1 | 24 Park Avenue | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BSU DMF UNIT 2 | 24 Park Avenue | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BSU DMF UNIT 3 | 24 Park Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BSU DMF UNIT 4 | 24 Park Avenue | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BSU TINSLEY UNIT 1 | Tinsley Center | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Bridgewater Senior Center | 10 Wally Krueger Way | 2 Level 2 | RED_E | |
| Bridgewater State University Tinsley Center | 325 Plymouth St | 2 Level 2 | Non-Networked | University hours |
| MCELWAIN SCHOOL STATION # 1 | 250 Main St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MCELWAIN SCHOOL STATION # 2 | 250 Main St | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 28.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.