EV charger installers in Reddick, FL
1 licensed installer based in Reddick.
What it really costs in Reddick
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Reddick
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Public EV charging in Reddick
Loading map…
3 public charging stations in Reddick: 4 Level 2 ports and 14 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| TA W Highway 318, Reddick, FL | 7401 W Highway 318 | 12 fast | BP_PULSE | 24 hours daily |
| DeConna Ice Cream | 6300 W Hwy 318 | 2 fast | EVGATEWAY | Mon: 6:00am-2:00pm; Tue: 6:00am-2:00pm; Wed: 6:00am-2:00pm; Thu: 6:00am-2:00pm; Fri: 6:00am-2:00pm |
| CHI UNIVERSITY | 9650 West Highway 318 | 4 Level 2 | Blink Network | Mon: 7:00am-6:00pm; Tue: 7:00am-6:00pm; Wed: 7:00am-6:00pm; Thu: 7:00am-6:00pm; Fri: 7:00am-6:00pm; Sat: 7:00am-6:00pm; Sun: 7:00am-6:00pm |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.