Connecticut EV Charging Program - residential Level 2 charger and wiring upgrade rebate (Eversource / UI)
up to $1,500
Up to $1,500 in rebates from 2 programs. 14 licensed installers based in Willimantic.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
up to $1,500
$100 one-time enrollment incentive; ongoing up to $120/year (Baseline tier) or up to $300/year (Advanced tier)
Loading map…
8 public charging stations in Willimantic: 26 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Eastern Connecticut State University - Shakespeare Parking Garage | 24 Charter Oak Dr | 6 Level 2 | Non-Networked | 24 hours daily; for student, faculty, and visitor use only |
| Eastern Market | 1051 Main St | 4 Level 2 | EVGATEWAY | 24 hours daily |
| Town of Windham Community Center | 645 Main St | 4 Level 2 | AMPUP | 24 hours daily |
| Windham Intermodal Transportation Center Garage | 17 Walnut St | 4 Level 2 | Non-Networked | 24 hours daily |
| Town of Windham Recreation Park | 50 Main St | 2 Level 2 | RED_E | |
| Windham High School | 355 High St | 2 Level 2 | Non-Networked | 24 hours daily |
| Windham Town Hall | 979 Main St | 2 Level 2 | RED_E | |
| Windham Town Hall | 979 Main St | 2 Level 2 | Non-Networked | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.