Connecticut EV Charging Program - residential Level 2 charger and wiring upgrade rebate (Eversource / UI)
up to $1,500
Up to $1,500 in rebates from 2 programs. 15 licensed installers based in Westport.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
up to $1,500
$100 one-time enrollment incentive; ongoing up to $120/year (Baseline tier) or up to $300/year (Advanced tier)
Loading map…
14 public charging stations in Westport: 49 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Baldwin Parking Lot | 35 Elm Street | 12 Level 2 | EV Connect | 24 hours daily |
| Saugatuck Station – Lot 1 | Park Street | 7 Level 2 | Blink Network | 24 hours daily |
| 1st Floor Parking | 85 Post Road West | 5 Level 2 | EVOKE | |
| Lower Level Parking | 85 Post Road West | 4 Level 2 | EVOKE | |
| Saugatuck Railroad Station Lot #3 | 1 Ferry Ln | 4 Level 2 | EV Connect | 24 hours daily |
| Fire HQ | 515 Post Rd East | 2 Level 2 | EV Connect | 24 hours daily |
| GFA STATION NORTH | 35 Beachside Ave | 2 Level 2 | ChargePoint Network | Mon: 6:30am-3:30pm; Tue: 6:30am-3:30pm; Wed: 6:30am-3:30pm; Thu: 6:30am-3:30pm; Fri: 6:30am-3:30pm |
| GFA STATION SOUTH | 35 Beachside Ave | 2 Level 2 | ChargePoint Network | Mon: 6:30am-3:30pm; Tue: 6:30am-3:30pm; Wed: 6:30am-3:30pm; Thu: 6:30am-3:30pm; Fri: 6:30am-3:30pm |
| Greens Farms Railroad Station Lot #1 | New Creek Rd | 2 Level 2 | Blink Network | 24 hours daily |
| National Hall | 2 Post Rd W | 2 Level 2 | AMPUP | Contact station for hours of availability. |
| Saugatuck Station – Lot 3 | 1 Ferry Lane | 2 Level 2 | Blink Network | 24 hours daily |
| The Westport Library | 20 Jesup Rd | 2 Level 2 | EV Connect | 24 hours daily |
| Town of Westport | 110 Myrtle Avenue | 2 Level 2 | Blink Network | 24 hours daily |
| Greens Farms Railroad Station Lot #2 | 2 Post Office Ln | 1 Level 2 | Blink Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.