Connecticut EV Charging Program - residential Level 2 charger and wiring upgrade rebate (Eversource / UI)
up to $1,500
Up to $1,500 in rebates from 3 programs. 90 licensed installers based in Norwalk.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
up to $1,500
$100 one-time enrollment incentive; ongoing up to $120/year (Baseline tier) or up to $300/year (Advanced tier)
Amount for 2025-2026 not confirmed (the 2024-2025 program paid up to $1,500 for charger + installation)
Loading map…
27 public charging stations in Norwalk: 95 Level 2 ports and 14 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Norwalk, CT - Tesla Supercharger | 47 Richards Ave | 12 fast | Tesla | 24 hours daily. Open to all vehicles. |
| Garavel Chrysler Jeep Dodge Ram | 300 Westport Ave | 2 fast, 4 Level 2 | EV Connect | 24 hours daily |
| Norwalk Hospital | 34 Maple St | 12 Level 2 | AMPUP | 24 hours daily |
| VDRS | 360 Dr Martin Luther King Jr Dr | 12 Level 2 | FLO | 24 hours daily |
| 40 Prospect Street | 40 Prospect St | 8 Level 2 | Non-Networked | 24 hours daily |
| Norwalk DMV | 540 Main Ave | 8 Level 2 | FLO | 24 hours daily |
| The Platform | 1 Chestnut St | 8 Level 2 | AMPUP | Contact station for hours of availability. |
| City of Norwalk City Hall - Tesla Destination | 125 East Ave | 6 Level 2 | Tesla Destination | 24 hours daily. Open to all vehicles. |
| East Norwalk Library | 51 Van Zant St | 4 Level 2 | Non-Networked | 24 hours daily |
| 164 WATER ST. 164 WATER ST #1 | 164 CT-136 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 164 WATER ST. 164 WATER ST #2 | 164 Water St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 200 CT AVE RLTY VISITOR PARKING | 200 US-1 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 34 Midrocks Drive | 34 Midrocks Dr | 2 Level 2 | Non-Networked | 24 hours daily |
| 45 GLOVER AVE STATION #1 | 45 Glover Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 45 GLOVER AVE STATION #2 | 45 Glover Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 901 MAIN AVE STATION #4 | 901 Main Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CHRGR #1 NORWALK LIBRARY | 10 Washington St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CLOCKTOWER CTC CHARGEPOINT | 25 Grand St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| City of Norwalk - Fodor Farm | 328 Flax Hill Rd | 2 Level 2 | AMPUP | Contact station for hours of availability |
| MERRITT7 301M7 | 301 Merritt 7 | 2 Level 2 | ChargePoint Network | Mon: 7:00am-7:00pm; Tue: 7:00am-7:00pm; Wed: 7:00am-7:00pm; Thu: 7:00am-7:00pm; Fri: 7:00am-7:00pm |
| MERRITT7 601M7 | 601 Merritt 7 | 2 Level 2 | ChargePoint Network | Mon: 7:00am-7:00pm; Tue: 7:00am-7:00pm; Wed: 7:00am-7:00pm; Thu: 7:00am-7:00pm; Fri: 7:00am-7:00pm |
| Norwalk DPW Operations Center - Tesla Destination | 15 S Smith St | 2 Level 2 | Tesla Destination | Mon-Fri: 7:00am-3:00pm. Open to all vehicles. |
| SPIREP IRON WORKS | 1 N Water St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| West Rocks Shell | 640 Main Ave | 2 Level 2 | EVGATEWAY | 24 hours daily |
| Aitoro Appliance | 401 Westport Ave | 1 Level 2 | Non-Networked | Store business hours; see inside for access |
Showing 25 of 27.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.