Connecticut EV Charging Program - residential Level 2 charger and wiring upgrade rebate (Eversource / UI)
up to $1,500
Up to $1,500 in rebates from 2 programs. 40 licensed installers based in New Britain.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
up to $1,500
$100 one-time enrollment incentive; ongoing up to $120/year (Baseline tier) or up to $300/year (Advanced tier)
Loading map…
39 public charging stations in New Britain: 132 Level 2 ports and 4 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| 10 Chestnut St | 10 Chestnut St | 4 fast | LOOP | 24 hours daily |
| 1222 Stanley Street | 1222 Stanley St | 12 Level 2 | Non-Networked | 24 hours daily |
| 400 Brittany Farms - Autumn Lakes | 400 Brittany Farms Rd | 8 Level 2 | Non-Networked | 24 hours daily |
| Blogoslawski Parking Garage | 14 Franklin Square | 8 Level 2 | AMPUP | 24 hours daily |
| 1380 East Street | 1380 East St | 4 Level 2 | Non-Networked | 24 hours daily |
| 152 Tremont Street | 152 Tremont St | 4 Level 2 | Non-Networked | 24 hours daily |
| 21 Dunlay Street | 21 Dunlay St | 4 Level 2 | Non-Networked | 24 hours daily |
| 250 North | 250 North St | 4 Level 2 | Non-Networked | 24 hours daily |
| 33 Dunlay Street | 33 Dunlay St | 4 Level 2 | Non-Networked | 24 hours daily |
| 378 South Main | 378 S Main St | 4 Level 2 | Non-Networked | 24 hours daily |
| 441 Allen Street | 441 Allen St | 4 Level 2 | Non-Networked | 24 hours daily |
| 447 Allen Street | 447 Allen St | 4 Level 2 | Non-Networked | 24 hours daily |
| 45 Dunlay Street | 45 Dunlay St | 4 Level 2 | Non-Networked | 24 hours daily |
| 68 Sexton Street | 68 Sexton St | 4 Level 2 | Non-Networked | 24 hours daily |
| 80 Farmington Ave | 80 Farmington Ave | 4 Level 2 | Non-Networked | 24 hours daily |
| 91 Broad Street | 91 Broad St | 4 Level 2 | Non-Networked | 24 hours daily |
| 97 Broad Steet | 97 Broad St | 4 Level 2 | Non-Networked | 24 hours daily |
| Farmington Plaza Site Poweral | 643 Farmington Ave | 4 Level 2 | RED_E | |
| Noble Energy - 240 Newington Ave. | 240 Newington Ave | 4 Level 2 | AMPUP | Contact station for hours of availability. |
| Poweral EV Charging Station - Farmington Plaza | 675 Farmington Ave | 4 Level 2 | Non-Networked | 24 hours daily |
| Szczesny Parking Garage | 35 Washington St | 4 Level 2 | AMPUP | 7am-5pm daily |
| Central Connecticut State University - Student Center Parking Garage | 165 Ella Grasso Blvd | 3 Level 2 | Non-Networked | 24 hours daily |
| Central Connecticut State University - Welte Hall Parking Lot | 105 Ella Grasso Blvd | 3 Level 2 | Non-Networked | 24 hours daily |
| Central Connecticut State University - Willard DiLoreto Parking Garage | 105 Ella Grasso Blvd | 3 Level 2 | Non-Networked | 24 hours daily |
| Central Connecticut State University- Welte Garage | 39 Ella Grasso Blvd | 3 Level 2 | Non-Networked | 24 hours daily |
Showing 25 of 39.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.